Aerial view of a new suburb with apartments, terraced homes, and parks beside a harbour

Working paper · Housing supply

Beyond Sufficiency

The economic case for enabling more development capacity: why "just enough" under the NPS-UD is rarely enough in practice.

15 to 20%statutory competitiveness margin: a floor, not proof of abundance
10key findings on capacity, demand, and contestability
3objections tested: infrastructure, transport emissions, productive land

The question

The National Policy Statement on Urban Development requires councils to enable at least enough development capacity to meet expected housing demand, plus a competitiveness margin of 15 to 20%. Housing and Business Development Capacity Assessments then test whether that bar has been met. In hearing after hearing, we are asked the same question: if the numbers say there is enough capacity on paper, why enable more? We wrote this paper to answer it properly, once, so that councils, panels, developers, and their advisers can weigh the argument in full rather than in the few paragraphs an individual assessment allows.

What we did

We examined how the sufficiency test is applied in practice and where it goes wrong. On the supply side, capacity that is difficult to realise is counted too readily: greenfield land held by owners with no intention to develop, and redevelopment capacity that depends on site assembly, finance, and consenting. On the demand side, household growth is treated as population divided by a fixed household size, when in constrained markets people crowd, delay leaving home, and stay in dwellings that no longer suit them, so suppressed demand is mistaken for true need. Comparing two uncertain estimates at a point and calling the difference a surplus creates false confidence. We then set out the economic case for enabling more, drawing on the Auckland upzoning evidence, and tested the three objections usually raised: infrastructure, transport emissions, and highly productive land.

The result

The central finding is an asymmetry. When too much capacity is enabled, some options simply go unused. When too little is enabled, scarcity is capitalised into land values, housing costs rise, and households are rationed by price. That damage is slow and expensive to unwind. The paper concludes that a well-functioning urban market needs capacity that is contestable and resilient, not merely sufficient on paper, and that the case for enabling more is strongest for strategically located, infrastructure-coordinated proposals advanced by applicants with the capability and intent to deliver. We cite the paper in our own assessments, and anyone working on plan changes, fast-track applications, or housing capacity assessments is free to use it, provided Insight Economics is acknowledged as the source.

Download the working paper (PDF, 1.1 MB) →