300 MWexport capacity, as proposed
75,000households powered, estimated
$85mestimated one-off regional GDP from construction
The question
Nova Energy proposed a 300 MW solar farm on about 500 hectares of an 868-hectare site near Twizel, in the Mackenzie District. Referral under the Fast-track Approvals Act, and then the substantive application, depended on showing regional and national benefits that outweigh the effects, so the economics had to be set out plainly at both stages.
What we did
We prepared the economic assessment for the referral in 2025 and the fuller assessment for the substantive application in 2026: multiplier analysis of construction and operations, and a total economic value comparison against the land's best rural alternative, dairy farming, over 50 years. When a neighbouring solar farm at Haldon was consented in August 2026 we added a cumulative effects memo, so the panel could see whether the two projects together changed the picture.
The result
An estimated $85 million of regional GDP and 570 FTE-years of construction work, with around 20 ongoing jobs, generation of about 525 GWh a year, enough for around 75,000 households, and an assessed economic value well above the dairy alternative. The project was referred in August 2025 and the substantive application, lodged in June 2026, is before the expert panel.